Setting up in Delta 3
The concept : Putting together a combined transport terminal and a logistics area on a same site.
Leading logistics platform with trimodal service (rail/road/waterway)
Total site area: over 400 hectares
Logistics infrastructure:
- 625,000 m² of warehouses already constructed
- 136,000 m² currently under construction
- 25,000 m² available for sale
Class A warehouses, available for lease or sale
Warehouses connected to the rail network:
- 1 warehouse of 39,000 m² in operation, operated by ECS 2XL
- 1 warehouse of 35,000 m², operated by Log's
- 1 railway cross-dock building of 11,000 m², operated by Geodis
On-site services:
- Commercial buildings
- 1 Total Energies service station,
- 1 AS24 service station,
- 1 VGAS station (CNG, LNG, charging stations),
- 1 secure 220-space heavy goods vehicle parking lot with driver reception (restrooms, showers, Wi-Fi, laundry, and takeaway sales)
- HGV and semi-trailer maintenance workshop (mechanics, bodywork, tires)
- Euralogistic Campus: training center dedicated to transport and logistics professions
- Latest-generation railway maintenance workshop, equipped with a pit tower, operated by Akiem
- Hotel-restaurant project
Companies located on Delta 3: Dachser, Décathlon, Leroy Merlin, Éveil & Jeux, U-Sleep, La Foir’Fouille, Rexel, Yusen Logistics (Yamaha Motor), Log’s (Kiabi), Géodis, ECS 2XL (Danone Waters and Ontex), Simastock, SED Supply Chain Solution, PepsiCo France
Current projects:
- L C Zone: 11,000 m² building Dedicated to courier/cross-dock with rail connection
- L D Zone: 136,000 m² warehouse under construction
- First phase to be delivered in September 2025
- Second phase planned for the end of 2025
- 15,000 m² dry warehouse: building permit obtained
|

|