Retourner à la page d'accueil

Version française

Setting up in Delta 3

The concept : Putting together a combined transport terminal and a logistics area on a same site.

Leading logistics platform with trimodal service (rail/road/waterway)

Total site area: over 400 hectares

Logistics infrastructure:

  • 625,000 m² of warehouses already constructed
  • 136,000 m² currently under construction
  • 25,000 m² available for sale

Class A warehouses, available for lease or sale

Warehouses connected to the rail network:

  • 1 warehouse of 39,000 m² in operation, operated by ECS 2XL
  • 1 warehouse of 35,000 m², operated by Log's
  • 1 railway cross-dock building of 11,000 m², operated by Geodis

On-site services:

  • Commercial buildings
  • 1 Total Energies service station,
  • 1 AS24 service station,
  • 1 VGAS station (CNG, LNG, charging stations),
  • 1 secure 220-space heavy goods vehicle parking lot with driver reception (restrooms, showers, Wi-Fi, laundry, and takeaway sales)
  • HGV and semi-trailer maintenance workshop (mechanics, bodywork, tires)
  • Euralogistic Campus: training center dedicated to transport and logistics professions
  • Latest-generation railway maintenance workshop, equipped with a pit tower, operated by Akiem
  • Hotel-restaurant project

Companies located on Delta 3:
Dachser, Décathlon, Leroy Merlin, Éveil & Jeux, U-Sleep, La Foir’Fouille, Rexel, Yusen Logistics (Yamaha Motor), Log’s (Kiabi), Géodis, ECS 2XL (Danone Waters and Ontex), Simastock, SED Supply Chain Solution, PepsiCo France

Current projects:

  • L C Zone: 11,000 m² building Dedicated to courier/cross-dock with rail connection
  • L D Zone: 136,000 m² warehouse under construction
    • First phase to be delivered in September 2025
    • Second phase planned for the end of 2025
    • 15,000 m² dry warehouse: building permit obtained
 Site map | News | Press releases | Pictures of Delta 3 | Virtual tour | General terms and conditions | Credits